Wet-service areas, containment curbs and drain surrounds
KOREA TOTAL SERVICE / PROFESSIONAL SERVICES
Polyurea lining & surface protection
Design substrate preparation, junctions and application controls around actual exposure—not fast reaction alone.
Request a quote with photos
Scope & target areas
Protective linings on suitable concrete or approved metal substrates
Continuous floor-to-wall, corner and penetration details
Repairs or interfaces with other coatings only after compatibility testing
Assessment to handover
Assess → Agree scope → Test → Execute → Inspect → Maintain
- Assess strength, moisture, contamination, cracks and exposure.
- Remove weak layers and create the required surface profile.
- Agree primer, reinforcement, penetrations, drains and edge details.
- Check product-specific equipment ratio, temperature and pressure in the specialist application plan.
- Control overspray and apply to agreed thickness and continuity.
- Inspect edges and defects; complete agreed adhesion or lining-integrity tests.
Inspection & reporting
- Preparation, primer, equipment and environment records
- Thickness, continuity, edges and penetrations
- Agreed pinhole/integrity and adhesion tests suited to the system
- Repairs and release for traffic, water or chemical exposure
Scope & application conditions
- Fast surface set differs from full cure and return to service.
- Chemical resistance depends on chemical, concentration, temperature and duration.
- Do not cover weak, contaminated or persistently wet substrates without a suitable design.
- Confirm overspray, ventilation, exposure controls and specialist application arrangements.
Choose floors by operating conditions
| System | Purpose to assess | Conditions to confirm |
|---|---|---|
| Epoxy | Industrial coating, lining and zoning | Moisture, strength, loads, chemicals, slip and ESD needs |
| Polyurethane | Distinguish floor, waterproofing and PU-cement systems | Movement, water, temperature, loads and outdoor exposure |
| Polyurea | Continuous lining and junction protection | Substrate, primer, equipment, overspray, thickness and exposure |
A material name alone does not define thickness, life or chemical resistance. Specify the selected system for the site.
Information for your quotation
- Area, substrate, previous coating and junction photographs
- Moisture, abrasion, impact and chemical exposure
- Required thickness, texture and inspection criteria
- Equipment access, ventilation and operating schedule
Start with site photographs
Send wide and close-up photographs, area, materials and operating conditions. Keep your reference and password to view your inquiry and photos.
Request a quote with photosTechnical references
General technical references only. They do not imply brand affiliation, qualifications or certification. Selected product data and customer procedures govern the final specification.
APPLICATION ENGINEERING
Technical design criteria
Application
Material · contamination · operating environment
Selection
Cleaning objective · compatibility · residue
Process
Application · contact · recovery · rinse · dry
Evaluation
Appearance · residue · maintenance interval
Selection goes beyond cleaning power. We consider material changes, workability, recovery and rinsing, repeated use and maintenance conditions.